Grouting project

Wind
A
Commissioning
5 months
Challenge

Our customer installed transition pieces (TPs) that had to be grouted after lifting. There was a need for a solution to transfer personnel and a 400kg grout hose safely and efficiently to the TPs.

Solution

The A-type provided safe access for the workers and a stable platform for the grout operation, with the grout hose supported by the gangway. This ensured an efficient installation, utilising the full potential of the vessel. The hose configuration has also been used for fuel and other liquid transfers.

The grout arm has enabled a safe, efficient and controlled operation. The development was in good cooperation between client and Ampelmann. It led to a faster installation than planned.