Project
Minimising ‘waiting on weather’ in O&M
Achievement
Downtime was significantly reduced as the A-type was used during periods of adverse weather
Offshore wind
A
Maintenance
Long term
Challenge
Our client was looking for a way to optimise the number of working days during their O&M campaign far offshore. There was a need for an offshore access solution with high workability and reliability.
Solution
The Ampelmann A-type provided safe access throughout the project, even during adverse weather conditions. Eventually, ‘waiting on weather’ was minimised to 2% for the overall project.
Project gallery
Walking over to a wind turbine made safe and easy
The Ampelmann A-type onboard and ready for work
"With the gangway, you can say that offshore work becomes onshore work."